The Samyang Group R&D Center is a project featuring a pure white image. This building is reminiscent of the 20th century neo-modernism and is an example of economic constraints acting as a decisive design motive. The condition that the construction cost should not exceed 2.5 million KRW per pyeong was an opportunity to devise the practical alternative of a pure white finish on the exposed concrete surface. Although the installation of a steel frame on the front façade serves as a passageway that connects three buildings, it resolves the distracting environment caused by the disorganized building units, and furthermore, became an important factor in the design identity of the project.